A bit of alterations need to be done, especially on the services part of the ground floor (need to reduce the circulation space). Plus, the decking (make it float) and the columns have to be reduced. The structure of the pods for the toilet need to be shown.

timeline of activities and spaces involved

 

basement

 

second floor plan

 

ground floor plan

 

third floor plan

 

first floor plan

 

mezanine